Portfolio: Projects Tagged Design Build

Popular Tags:  Build to suit, Design Build, Expansion, Market Store, New Construction, Remodel, Renovation, Retail

139

First Baptist Church

Martin, Tennessee This project includes the demolition of the old admin building and sanctuary and the construction of a new 1,100 seat sanctuary and a two story education and administration building. Projected completion in…

View Project
35

Retail Strip Center (Sommerville, TN)

Somerville, Tennessee Built multiple strip retail centers for out of state developer.  Completed tenant build out requirements in addition to exterior structure. Project Highlights Approximately 16,000 SF Project Images

View Project
36

Retail Strip Center (Atoka, TN)

Atoka, Tennessee Built multiple strip retail centers for out of state developer.  Completed tenant build out requirements in addition to exterior structure. Project Highlights Approximately 16,000 SF Project Images

View Project
37

Retail Strip Center (Murray, KY)

Murray, Kentucky Built multiple strip retail centers for out of state developer.  Completed tenant build out requirements in addition to exterior structure. Project Highlights Approximately 16,000 SF Project Images

View Project
127

Milan First Baptist Church – Phase 1

Milan, Tennessee This project includes a new 18,600 SF Children’s Center, new Atrium Enterance Hall, and modifications to existing classrooms.  Also included in this project are modifications to the Fellowship Hall, which includes an…

View Project
128

Church of Christ (Sycamore Chapel)

Ashland City, Tennessee Completed initial planning and drawings.  Project is currently awaiting approval for financing. Project Highlights Project Images

View Project
124

Retail Strip Center (Milan, TN)

Milan, Tennessee Strip Retal Center consisted of a state of the art stone and metal constructed building.  The retail center is approximately 16,000 SF.  The building consists of space for 5 tenants. Project Highlights…

View Project
120

Rail Car Unloading Area

Dyersburg, Tennessee Design Build project.  TOSHA lead project in construction of railcar loading and unloading facility. Project Highlights Designed facility to meet budget requirements Designed facility to adhere to TOSHA standards for spill containment…

View Project
107

Movie Gallery

Somerville, Tennessee Completed Design Build project for multi site developer. Project Highlights Approximately 4,000 SF Completed site preperation and paving for multi location developer Completed tenant build out requirements Project Images

View Project
100

Medina Skating Center

Medina, Tennessee Design build project.  Completed site preparation work and building construciton. Project Highlights Approximately 10,000 SF Partnered with owner to complete build out requirements including decorating and painting Project Images

View Project
94

Dollar General (Design Build)

Dawsonville, Georgia – Design Build Preparation of site to meet local, state, and federal building codes.  Preperation includes, but is not limited to: Demolition, Hazardous Material Removal and Remediation, and Site Engineering and Grading….

View Project
88

First Cumberland Presbyterian

Milan, Tennessee Construction Management project.  Completed addition to facility along with a remodel of the existing kitchen and nursery. Project Highlights Approximately 3,600 SF (New Construction), 4,000 SF (Renovations) New Fellowship Hall Renovations and…

View Project
66

Physicians Quality Care (2009)

Jackson, Tennessee Construction Management project.  Worked with owner and architect to develop budgets.  Coordinated design elements to maximize return and profitability for owner.  Completed project ahead of owners aggressive schedule. Project Highlights Approximately 11,000…

View Project
62

Sitka Church of Christ

Milan, Tennessee Project is currently in the Master Plan Phase.  This project will include renovations and remodels to the existing building. Project Highlights Project Images

View Project
52

First United Methodist Church (2006)

Medina, Tennessee This project was a ground up project.  Along with constructing a new 300 seat Sanctuary, administrative offices, classrooms, and a fellowship center/gym were constructed. Project Highlights Approximately 18,000 SF Complete New Site Development…

View Project
49

Milan Army Ammunition Arsenal

Milan, Tennessee Completed transite roofing replacement with new standing seam roofing system.  The new standing seam room covered the storage building, production building, and covered walk way at an operating military production facility. Project…

View Project
40

Dollar General (Market Store)

Huntsville, AL – Market Store Reengineer existing building to meet owner/tenant specifications.  Both interior and exterior modivications are made. Project Highlights Interior changes include: Acoustical Ceiling Tile, HVAC, New Plumbing and Electrical Systems, Drywall,…

View Project
47

FedEx

Tennessee & Oklahoma Design Build project.  Worked with owner on site selection thrugh commissioning of facility. Project Highlights Approximately 56,000 SF Administrative Offices Sorting and Distribution Center Builder Initiated Change Orders: <1% Project Images

View Project
42

Muarry

McKenzie, Tennessee Interior and exterior retrofit of old manufacturing facility.  The retrofit included the removal of the abandoned production system and a remodel of the office space. Project Images

View Project
108

Paris Surgery Center (2007)

Paris, Tennessee Construction Management project.  Expanded existing practice while still in use.  Because of challenging site requirements, changes in facility design had to be made.  The changes in facility design lead to improved functionality….

View Project
25

Light House Pentecostal Church (2010)

Jackson, Tennessee Design Build project.  Developed master plan for new 33 acre site after tornado destroyed old church campus.  Completed construction on phase 1 of the plan. Project Highlights New Church Facility includes: Master…

View Project
13

Chapel Hill Baptist Church

Milan, Tennessee This project included 3 phases to the consturction.  Construction included a new Family Life Center and a new Sanctuary which totaled over 41,000 SF. Project Highlights Phase 1: Family Life Center (18,000 SF),…

View Project
Contact Us Today!